Rogz Control Long Lead
$57.93
Description
Ingredients
Reviews
The Control Lead by Rogz is the perfect lead for taking control of your dog on walks. Having control of your dog is essential for a happy dog and a happy owner, and the right type of walking equipment can help.
Shock Absorbing Webbing - Eases the pull strength and pressure placed on your dog.
ShocLoc Control - Designed to lock out the absorbing function of the bungee.
SnapLoc Trigger Hook - Ensures control and safety for you and your dog.
Reflective Stiching - Reflective Yarn woven into webbing and piping for night visibility.
Waste Bag Holder - Accessory to hold your waste bag.
Materials:
Webbing and Reflective Stiching: Nylon/Polyester
Shock Absorber: Neoprene
Metal Parts: Zinc
No reviews yet
Essential ReadingRead all